Flooding in the HCA Watershed
Watercourse flooding in the HCA watershed can be caused by a number of factors, including heavy rainfall, thunderstorms, excess snowmelt, or a combination of rainfall and snowmelt. Additionally, flooding along the Lake Ontario shoreline can be caused by high lake levels and significant shorebound waves.
Areas that are vulnerable to watercourse or shoreline flooding are called ‘floodplains’ or ‘flood hazard lands’. In Ontario, these areas are managed by Conservation Authorities to protect residents from loss of life, reduce property damage, and minimize social disruption in the event of a severe flood.
Floodplains and flood hazard lands are all different. Some watercourses flood more frequently than others, and some not at all. Some watercourses may take weeks to flood, and others flood in a matter of hours or minutes, depending on local conditions and the severity of the event. The majority of the creeks in the HCA watershed respond to runoff events relatively quickly, on a scale of minutes to days.
The Lake Ontario shoreline within the HCA area requires high lake levels and high waves for flooding to occur.
HCA Flood Management Approach
HCA informs planners, developers, and the general public about the risks of flooding. This promotes proper land use planning and regulation of development on floodplains and flood hazard lands, thus preventing people from living and/or working in flood-prone areas, where possible.
To protect against watercourse flooding, HCA operates and maintains two large dams: one at Valens Lake Conservation Area and the other at Christie Lake Conservation Area. HCA also owns large tracts of land in hazardous areas such as wetlands, which act as natural storage for floodwaters.
HCA is responsible for forecasting where and when flooding is likely to occur within the HCA watershed and issuing appropriate messages. It is imperative that floods are forecast to the earliest extent possible.
Advance warning of an impending flood allows municipalities and other government agencies to implement emergency response plans and, if necessary, evacuate communities. Early public notification of developing or ongoing unsafe watercourse and shoreline conditions allows individuals to take precautions. Take heed of the message issued. Be prepared to follow the advice and instructions of emergency response officials.
In addition, it is critical that municipalities prepare and implement plans which allow a quick response to emergency situations created by flooding. HCA works with the Ontario Ministry of Natural Resources to provide municipalities with advice on preparing flood contingency plans and during the emergency response process.
HCA issues different types of flood messages:

Watershed Conditions Statement:
Water Safety
General notice of potential for dangerous watercourse or shoreline conditions, but no flooding is expected. High flows, high lake levels, melting ice, or other factors could pose risks to some users, such as boaters, anglers, and swimmers.

Watershed Conditions Statement:
Flood Outlook
General early notice of potential for watercourse or shoreline flooding based on weather forecasts calling for heavy rain, snow melt conditions, high lake levels, or high shorebound winds.

Flood Watch
Potential for flooding exists within specific watercourses or shorelines. Municipalities, emergency services and individual landowners in flood-prone areas should prepare.

Flood Warning
Flooding is imminent or occurring within specific watercourses or shorelines. Municipalities, emergency services and individual landowners should take action to deal with flood conditions. This may include road closures and evacuations.
Additional aspects of HCA’s Flood Forecasting and Warning (FFW) program are below:
- Maintain an information and knowledge base on expected rainfall-runoff, snowmelt-runoff, and shoreline-flooding characteristics across areas within the HCA watershed that are vulnerable to flooding events.
- Maintain and utilize a streamflow and rain monitoring network that provides current and past watercourse conditions and rainfall amounts.
- Maintain and utilize a snowpack monitoring network that provides current and past snowpack conditions.
- Review forecasts of local weather and Lake Ontario conditions (expected amounts of rain, possibility of thunderstorms, predicted lake levels, expected wave heights, etc).
- Review and consider local relevance of flood-related messages, bulletins and information issued by other flood risk-related agencies.
- Assess the expected potential for watercourse and shoreline flooding, based on the above information, in accordance with available provincial guidelines.
- Identify flood preparedness/response actions to be taken by HCA, in accordance with available provincial guidelines, which include:
- Issue flood messages that detail current flooding conditions and expected future flooding conditions to municipal staff, emergency services, school boards, other flood risk-related agencies, media, etc.
- Continue FFW re-assessments during the storm event and after.
- Monitor public and media observations and reports of flooding.
- Undertake site observations of watercourse and shoreline flooding conditions.
- Adjust dam outflows (where suitable) to manage flooding conditions downstream and upstream.
- Assist in documenting flood events.